It is intended to assist local authorities with the form and content of these reports. Compiling the Consultation Report has been updated to reflect emerging best practice and lessons learned since the original Advice Note 14 was published in 2014. Advice note 10 has been substantially revised to provide practical guidance on how to submit Habitats Regulations Assessment information with an application and how the Planning Act 2008 process, as amended by the Localism Act 2011, will address HRA. The developers pre-application consultation, publicity and notification duties (version 1 April 2012) was retired. If screening and scoping requests are submitted simultaneously for the same project, the 42 day period starts from the date that the Secretary of State adopts a positive screening opinion (Regulation 10(7)).) It identifies the stages of the Habitats Regulations Assessment (HRA) process and clarifies the information to be provided with a DCO application with respect to HRA at each stage of the Planning Act 2008 process. 3.5 An EIA screening opinion adopted during the pre-application process will necessarily be based on currently available information provided by the Applicant. 2.1The Inspectorate understands that measures required in response to COVID-19 had consequences for Applicants ability to obtain relevant environmental information for the purposes of their assessment. Introduction. It also addresses changes in industry good practice and other relevant guidance, to the extent that it is necessary, which affect the Planning Inspectorates recommended approach to the assessment of cumulative effects. Email. (Amendment) Regulations 2020 on 31 December 2020. (Applicants should notify under this regulation if the development is Schedule 1 or, if Schedule 2, they decide to undertake an EIA of their own volition.). One text change was also applied, the reference to the Welsh Language Board as a non-prescribed consultation body was removed following the abolition of this organisation on 1 April 2012. a description of the Proposed Development, including its location and technical capacity; an explanation of the likely significant effects of the development on the environment; and. Advice Note 22 has been updated to clarify the notation that should be used with respect to a combined order. Status of this Advice Note. It was first issued in 2012, and revised in 2018, but current policy is set out in the 2019 edition. PDF Developments of National Significance DNS Engaging with the Process These circumstances are when, before the commencement of the EIA Regulations 2017, one of the following has taken place: 1.9 Applicants should refer to the previous version (Version 5) of this Advice Note for developments where the 2009 EIA Regulations continue to apply. The advice note also includes updated information relating to the fee arrangements for applications and examinations. This advice note has been republished in response to emerging best practice on projects. Cookies are files saved on your phone, tablet or computer when you visit a website. This advice note has been revised in response to emerging best practice and to clarify the duties on the Secretary of State and the role of the European Economic Area Member States and the Planning Inspectorate in the process. This Advice Note forms part of a suite of such advice provided by the Planning Inspectorate available on our website. The Planning Inspectorate will agree to scope out, from the need for further assessment, aspects and matters where it is appropriate to do so. Updated to reflect ways of working noting circumstances of coronovirus (COVID-19). Rights of way advice notes - GOV.UK The Planning Inspectorate is also required to notify the consultation bodies of the duty imposed on them under Regulation 11(3) of the EIA Regulations, that if requested by the Applicant, they must enter into consultation with that person to determine whether they possess any information which is considered relevant to the preparation of the ES or the updated ES; and, if that is the case, they must make that information available to the Applicant. Site content: Copyright 2012 The Planning Inspectorate, Daventry International Rail Freight Terminal, Daventry International Rail Freight Terminal Expansion, East Midlands Gateway Rail Freight Interchange, East Northants Resource Management Facility, East Northants Resource Management Facility Western Extension, Hinckley National Rail Freight Interchange, Northampton Gateway Rail Freight Interchange, Outer Dowsing Offshore Wind (Generating Station), A14 Cambridge to Huntingdon Improvement Scheme, A428 Black Cat to Caxton Gibbet Road Improvement scheme, Cambridge Waste Water Treatment Plant Relocation, East Anglia Green Energy Enablement (GREEN) Project, East West Rail Bedford to Cambridge and Western improvements, Larkshall Mill Aggregate Manufacturing and Carbon Capture Facility, Medworth Energy from Waste Combined Heat and Power Facility, Palm Paper 3 CCGT Power station Kings Lynn, Rookery South Energy from Waste Generating Station, Sheringham and Dudgeon Extension Projects, Woodside Link Houghton Regis Bedfordshire, Expansion of Heathrow Airport (Third Runway), North London (Electricity Line) Reinforcement, A1 Birtley to Coal House Improvement Scheme, A1 in Northumberland Morpeth to Ellingham, A19/A1058 Coast Road Junction Improvement, Boston Alternative Energy Facility (BAEF), International Advanced Manufacturing Park TWO (IAMP TWO), A57 Link Roads (previously known as Trans Pennine Upgrade Programme), A585 Windy Harbour to Skippool Improvement Scheme, Morecambe Offshore Windfarm Generation Assets, Morgan and Morecambe Offshore Wind Farms Transmission Assets, Morgan Offshore Wind Farm Generation Assets, Preesall Saltfield Underground Gas Storage, Hampshire Water Transfer and Water Recycling Project, M25 junction 10/A3 Wisley interchange improvement, Oxfordshire Strategic Rail Freight Interchange, Perrys Farm Hazardous Waste Management Facility, Wheelabrator Kemsley Generating Station (K3) and Wheelabrator Kemsley North (WKN) Waste to Energy Facility, A30 Temple to Higher Carblake Improvement, Bere Alston to Tavistock Railway Reinstatement and Associated Trails, Hinkley Point C New Nuclear Power Station, Hinkley Point C New Nuclear Power Station Material Change 1, Portishead Branch Line MetroWest Phase 1, Internal Power Generation Enhancement for Port Talbot Steelworks, Mid Wales Electricity Connection (N Grid), SP Mid Wales (Electricity) Connections Project (SP Manweb), Reinforcement to North Shropshire Electricity Distribution Network, Stafford Area Improvements Norton Bridge Railway, A160 A180 Port of Immingham Improvement, Able Marine Energy Park Material Change 1, Able Marine Energy Park Material Change 2, Continental Link Multi-Purpose Interconnector, Dogger Bank Teesside A / Sofia Offshore Wind Farm (formerly Dogger Bank Teesside B) Project previously known as Dogger Bank Teesside A&B, Drax Bioenergy with Carbon Capture and Storage Project, Ferrybridge D Combined Cycle Gas Turbine (CCGT) Power Station Project, Ferrybridge Multifuel 2 (FM2) Power Station, Hornsea Offshore Wind Farm (Zone 4) Project One, Hornsea Offshore Wind Farm (Zone 4) Project Two, North Doncaster Rail Chord (near Shaftholme), River Humber Gas Pipeline Replacement Project, White Rose Carbon Capture and Storage Project, Yorkshire and Humber CCS Cross Country Pipeline, Submitting an application for development consent, About the National Infrastructure Planning website, Cookies on the National Infrastructure site, Appendix 1 Preparing the technical index to accompany an NSIP application, Appendix 2 Electronic Application Index, Appendix 3 Section 55 Acceptance of Applications Checklist, Advice Note 8.1: Responding to the developers pre-application consultation, Advice Note 8.2: How to register to participate in an Examination, Advice Note 8.3: Influencing how an application is Examined: the Preliminary Meeting, Advice Note 8.5: The Examination: hearings and site inspections, Advice Note 8.6: Virtual examination events, Annex A Cyfoeth Naturiol Cymru/Natural Resources Wales, Annex G The Health and Safety Executive, Annex H Evidence Plans for Habitats Regulations Assessments of Nationally Significant Infrastructure Projects, Annex 1 the Inspectorates long form transboundary screening proforma, Annex 2 the Inspectorates short form transboundary screening proforma, Advice Note two: The role of local authorities in the development consent process, Advice Note Three: EIA Notification and Consultation, Advice Note Four: Section 52: Obtaining information about interests in land (Planning Act 2008), Advice note Five: Section 53 Rights of Entry (Planning Act 2008), Advice Note Six: Preparation and submission of application documents, Advice Note Six, Appendix One Preparing the application index to accompany an NSIP application, Advice Note Seven: Environmental Impact Assessment: Process, Preliminary Environmental Information and Environmental Statements, Advice Note Eight: Overview of the nationally significant infrastructure planning process for members of the public and others, Advice Note 8.3 Influencing how an application is Examined: the Preliminary Meeting, Advice Note Ten: Habitats Regulations Assessment relevant to nationally significant infrastructure projects, Advice Note Eleven: Working with public bodies in the infrastructure planning process, Advice Note Eleven, Annex A Cyfoeth Naturiol Cymru / Natural Resources Wales, Advice Note Eleven, Annex B Marine Management Organisation, Advice Note Eleven, Annex C Natural England and the Planning Inspectorate, Advice Note Eleven, Annex D Environment Agency, Advice Note Eleven, Annex E: Working with public bodies in the infrastructure planning process Historic England, Advice Note Eleven, Annex F Nuclear Regulators, Advice Note Eleven, Annex G The Health and Safety Executive, Advice Note Eleven, Annex H Evidence Plans for Habitats Regulations Assessments of Nationally Significant Infrastructure Projects, Advice Note Twelve: Transboundary Impacts and Process, Advice note thirteen: Preparation of a draft order granting development consent and explanatory memorandum, Advice Note Fourteen: Compiling the Consultation Report, Advice Note Fifteen: Drafting Development Consent Orders, Advice Note Sixteen: Requests to change applications after they have been accepted for examination, Advice Note Seventeen: Cumulative effects assessment relevant to nationally significant infrastructure projects, Advice Note Eighteen: The Water Framework Directive, Updated to establish optimised change request process, Update to clarify pre-submission requirements and submission methods, Updated to include advice on video submissions, Updated sources of further information and general update for clarity and currency, The Advice Note has been updated to reflect changes in legislation, guidance and suggested ways of working, Annex 3 updated to reflect changes made to The Infrastructure Planning (Applications: Prescribed Forms and Procedures) Regulations 2009 following the coming into force of The Infrastructure Planning (Publication and Notification of Applications etc.) The purpose of this Annex (PDF 213kb) is to provide useful advice to support applicants with the preparation of their Environmental Statement. The Planning Inspectorate refers to aspects as meaning the relevant descriptions of the environment identified in accordance with the EIA Regulations. On 23 March 2016 the Planning Inspectorate published revised versions of its four . Applicants should consider carefully the timing of the screening request (including the process described below in Advance notice and GIS shapefile) alongside the preparation of the DCO application. The Advice Note also provides advice to Applicants to support them with the successful completion of the process applicable to NSIPs. This advice note also identifies non-prescribed consultation bodies that the Planning Inspectorate may consult on a discretionary basis. 3.3 An Applicant making a request for a screening opinion under Regulation 8(1)(a) of the EIA Regulations must provide a sufficient level of information in accordance with the EIA Regulations (see Insert 1). We use Google Analytics to measure how you use the website so we can improve it based on user needs. The Inspectorate has published a series of advice notes on the National Infrastructure Planning website, including Advice Note 7: Environmental Impact Assessment: Preliminary Environmental Information, Screening and Scoping (AN7). the pages you visit on this site, and how long you spend on each page, what you click on while you're visiting the site. 4.2 In accordance with Regulation 11(1)(b) of the EIA Regulations, the Planning Inspectorate will provide the Applicant with a list of the notified consultation bodies and any Regulation 11(1)(c) persons. Updated to reflect legislative changes from the Infrastructure Planning Environmental Impact Assessment Regulations 2017, the Conservation of Habitats and Species Regulations 2017 and the Conservation of Offshore Marine Habitats and Species Regulations 2017. changes to reflect the coming into force of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017. Appendix 1 - Preparing the technical index to accompany an NSIP application. Applicants should avoid submitting requests with multiple and varied design and layout options. Press office is open from 09:00 to 17:00 on Monday to Friday, except bank holidays. This advice note explains the roles and responsibilities of the Secretary of State, the PlanningInspectorate, European Economic Area Member States and applicant applicable under Regulation 32 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017. Start letter and initial work. It was replaced as a non-prescribed consultation body by the Welsh Language Commissioner which now delivers this function. 5.6 When a scoping opinion is requested and Regulation 8(1) has not yet been completed, the Planning Inspectorate will request the Applicant to provide notification in accordance with Regulation 8(1)(b); that they propose to provide an ES in respect of that development. Advice Note Thirteen: Preparation of a draft Development Consent Order and Explanatory Memorandum Republished February 2019 (version 3). Annex to advice note 3 - The Construction Information Service types and characteristics of the potential impacts. 5.7 An effective scoping process should enable the refinement of the assessment and ultimately the information required to form the ES. The Inspectorate is required to take into account the advice it receives from the statutory consultation bodies and will continue to do so in this regard. AN7 and its annexes provide guidance on EIA processes during the preapplication stages 3.7 Applicants are also referred to the Planning Inspectorate's 'Prospectus for Applicants', which explains the service offered by the Planning Inspectorate to Applicants at the pre-application stage, including . The Planning Inspectorate recommends that any non-statutory consultation is undertaken in advance of the formal process to avoid any overlap with the Planning Inspectorates statutory scoping consultation process. The Planning Inspectorate requires Applicants to provide a GIS shapefile and requests notice of intended scoping requests (see below Advance notice and GIS shapefile). Is there a clear route to deliver the measures referred to above on which reliance is being placed e.g. Annex has been updated to reflect current practice. Is there sufficient detail and certainty regarding the location and characteristics of the Proposed Development? Advice Note Six: Preparation and submission of application documents (version 11), This advice note will assist applicants in preparing, organising and submitting applications to the Planning Inspectorate. . the preparation of an ES or updated ES, as appropriate, by the Applicant; the carrying out of any consultation, publication and notification required under the Regulations or, as necessary, any other enactment in respect of EIA development; and. Minor updates were made to information in the advice note in response to some industry developments, and clarifications were also made throughout the text in particular in relation to how applicants should prepare their information during the pre-application stage. This Advice Note seeks to provide: a brief description of the legal context and obligations placed on an applicant, with respect to cumulative effects under national planning policy and the EIA Regulations (the Planning Inspectorate's Advice . it should be a polygon geometry type and consist of one or more polygon features representing the proposed DCO site boundary (including any temporary, permanent and associated development); it should be a single, valid, ESRI Shapefile for the proposed DCO site boundary, provided as a *.zip file using the default WinZip settings (ie no encryption, normal compression etc. Schedule 3 is only relevant to Schedule 2 projects). Planning Inspectorate Published 1 January 2010 Last updated . However, because the information is already published and accessible to you, it is exempt under Section 21 of FOIA. Is there a method of avoidance or mitigation that would reduce the impact on the aspect/matter to a level where significant effects would not occur? Rights of way guidance booklet - GOV.UK It also provides advice to Interested Parties and others about how to engage in the process when a change to an application is proposed. 1.8 Regulation 37 of the EIA Regulations sets out the circumstances where the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (the EIA Regulations 2009) continue to apply. Google Analytics sets cookies that store anonymised information about: Please enable Strictly Necessary Cookies first so that we can save your preferences! It has no statutory status. The purpose of this advice note is to explain the approach taken by the Planning Inspectorate, on behalf of the Secretary of State, when identifying consultation bodies to be notified under Regulation 11 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (the EIA Regulations) and where relevant, consulted on the scope of the Environmental Statement under Regulation 10 of the EIA Regulations. Site content: Copyright 2012 The Planning Inspectorate, Daventry International Rail Freight Terminal, Daventry International Rail Freight Terminal Expansion, East Midlands Gateway Rail Freight Interchange, East Northants Resource Management Facility, East Northants Resource Management Facility Western Extension, Hinckley National Rail Freight Interchange, Northampton Gateway Rail Freight Interchange, Outer Dowsing Offshore Wind (Generating Station), A14 Cambridge to Huntingdon Improvement Scheme, A428 Black Cat to Caxton Gibbet Road Improvement scheme, Cambridge Waste Water Treatment Plant Relocation, East Anglia Green Energy Enablement (GREEN) Project, East West Rail Bedford to Cambridge and Western improvements, Larkshall Mill Aggregate Manufacturing and Carbon Capture Facility, Medworth Energy from Waste Combined Heat and Power Facility, Palm Paper 3 CCGT Power station Kings Lynn, Rookery South Energy from Waste Generating Station, Sheringham and Dudgeon Extension Projects, Woodside Link Houghton Regis Bedfordshire, Expansion of Heathrow Airport (Third Runway), North London (Electricity Line) Reinforcement, A1 Birtley to Coal House Improvement Scheme, A1 in Northumberland Morpeth to Ellingham, A19/A1058 Coast Road Junction Improvement, Boston Alternative Energy Facility (BAEF), International Advanced Manufacturing Park TWO (IAMP TWO), A57 Link Roads (previously known as Trans Pennine Upgrade Programme), A585 Windy Harbour to Skippool Improvement Scheme, Morecambe Offshore Windfarm Generation Assets, Morgan and Morecambe Offshore Wind Farms Transmission Assets, Morgan Offshore Wind Farm Generation Assets, Preesall Saltfield Underground Gas Storage, Hampshire Water Transfer and Water Recycling Project, M25 junction 10/A3 Wisley interchange improvement, Oxfordshire Strategic Rail Freight Interchange, Perrys Farm Hazardous Waste Management Facility, Wheelabrator Kemsley Generating Station (K3) and Wheelabrator Kemsley North (WKN) Waste to Energy Facility, A30 Temple to Higher Carblake Improvement, Bere Alston to Tavistock Railway Reinstatement and Associated Trails, Hinkley Point C New Nuclear Power Station, Hinkley Point C New Nuclear Power Station Material Change 1, Portishead Branch Line MetroWest Phase 1, Internal Power Generation Enhancement for Port Talbot Steelworks, Mid Wales Electricity Connection (N Grid), SP Mid Wales (Electricity) Connections Project (SP Manweb), Reinforcement to North Shropshire Electricity Distribution Network, Stafford Area Improvements Norton Bridge Railway, A160 A180 Port of Immingham Improvement, Able Marine Energy Park Material Change 1, Able Marine Energy Park Material Change 2, Continental Link Multi-Purpose Interconnector, Dogger Bank Teesside A / Sofia Offshore Wind Farm (formerly Dogger Bank Teesside B) Project previously known as Dogger Bank Teesside A&B, Drax Bioenergy with Carbon Capture and Storage Project, Ferrybridge D Combined Cycle Gas Turbine (CCGT) Power Station Project, Ferrybridge Multifuel 2 (FM2) Power Station, Hornsea Offshore Wind Farm (Zone 4) Project One, Hornsea Offshore Wind Farm (Zone 4) Project Two, North Doncaster Rail Chord (near Shaftholme), River Humber Gas Pipeline Replacement Project, White Rose Carbon Capture and Storage Project, Yorkshire and Humber CCS Cross Country Pipeline, Submitting an application for development consent, About the National Infrastructure Planning website, Cookies on the National Infrastructure site, the Advice Notes section of the National Infrastructure Planning website, Environmental Impact Assessment (EIA) The Process, Coronavirus (COVID-19) environmental information and data collection, Notification of the EIA consultation bodies, The role of Preliminary Environmental Information (PEI), Information published on the National Infrastructure Planning website, Advice Note two: The role of local authorities in the development consent process, Advice Note Three: EIA Notification and Consultation, Advice Note Four: Section 52: Obtaining information about interests in land (Planning Act 2008), Advice note Five: Section 53 Rights of Entry (Planning Act 2008), Advice Note Six: Preparation and submission of application documents, Advice Note Six, Appendix One Preparing the application index to accompany an NSIP application, Advice Note Seven: Environmental Impact Assessment: Process, Preliminary Environmental Information and Environmental Statements, Advice Note Eight: Overview of the nationally significant infrastructure planning process for members of the public and others, Advice Note 8.1: Responding to the developers pre-application consultation, Advice Note 8.2: How to register to participate in an Examination, Advice Note 8.3 Influencing how an application is Examined: the Preliminary Meeting, Advice Note 8.5: The Examination: hearings and site inspections, Advice Note 8.6: Virtual examination events, Advice Note Ten: Habitats Regulations Assessment relevant to nationally significant infrastructure projects, Advice Note Eleven: Working with public bodies in the infrastructure planning process, Advice Note Eleven, Annex A Cyfoeth Naturiol Cymru / Natural Resources Wales, Advice Note Eleven, Annex B Marine Management Organisation, Advice Note Eleven, Annex C Natural England and the Planning Inspectorate, Advice Note Eleven, Annex D Environment Agency, Advice Note Eleven, Annex E: Working with public bodies in the infrastructure planning process Historic England, Advice Note Eleven, Annex F Nuclear Regulators, Advice Note Eleven, Annex G The Health and Safety Executive, Advice Note Eleven, Annex H Evidence Plans for Habitats Regulations Assessments of Nationally Significant Infrastructure Projects, Advice Note Twelve: Transboundary Impacts and Process, Advice note thirteen: Preparation of a draft order granting development consent and explanatory memorandum, Advice Note Fourteen: Compiling the Consultation Report, Advice Note Fifteen: Drafting Development Consent Orders, Advice Note Sixteen: Requests to change applications after they have been accepted for examination, Advice Note Seventeen: Cumulative effects assessment relevant to nationally significant infrastructure projects, Advice Note Eighteen: The Water Framework Directive. Is there sufficient confidence in the avoidance or mitigation method in terms of deliverability and efficacy to support the request? The Planning Inspectorate has taken steps to keep this e-mail and any attachments free from viruses. 6.5 Video or audio information should not be submitted except by prior agreement with the Inspectorate as it will not be certain that all interested parties involved will have the appropriate equipment to view the information. The Planning Inspectorate must take into account the information provided by Applicants, the results of any relevant EU environmental assessment reasonably available, and relevant criteria in Schedule 3 to the EIA Regulations (Regulation 9 and Schedule 3 of the EIA Regulations. Advice Note Two seeks to provide advice about the important role of local authorities at different stages of the Planning Act 2008 process. The Inspectorate will adopt a flexible approach, balancing the requirement for suitable rigour and scientific certainty in assessments, examinations, recommendations and decisions with pragmatism noting the ongoing need to support the preparation and determination of applications in a timely fashion. 8.1 As part of their pre-application consultation duties, Applicants are required to prepare a Statement of Community Consultation (SoCC).